Location: ERBİL
Employer: AHRAM GENERAL COMPANY-IRAQ
Contractor: Acrom holdıng group , Inc.
Location: Cyprus
Employer: PARILTI DENİZCİLİK LTD. ŞTİ.
Location: KÖRFEZ
Employer: TÜPRAŞ
Location: Aliağa
Employer: İLK İNŞAAT TAAHHÜT SAN.TİC.A.Ş.
PROCESS LINES 900000 “
Naphta Hydrotretater (120),
Kerosene Hydroprocessor (130),
CCR (160),
Sulfur Recovery (430),
Amine Renewal (420),
Phenolic and Non-Phenolic Sour Water Scraper (440),
Common Benefit Generation (500),
Cooling Tower (560)
Interconnection Pipe Rack (600)